Renewable energy projects boreholes

Boreholes required for the sites of electrical energy generation from solar energy

Area (Dunam) Number of boreholes Total linear meters
Less than 25 dunam 13 65 mw
25-50 dunam 17 85 mw
50-100 dunam 25 125 mw
100-250 dunam 50 250 mw
250-500 dunam 80 400 mw

For areas exceeding 500 dunams, a borehole shall be added per 7 dunams with a depth of 5 mw per one borehole.

If there are buildings at the site, the number of boreholes and their depth shall be treated as provided for in the applicable codes in respect hereof.

  • All required tests and studies shall be conducted in the site inspection report as per the applicable codes, especially the chemical, physical and mechanical tests.
  • All required additional tests shall be conducted by the designer.
  • Electrical resistance test shall be conducted.
  • 1 JD  per linear meter shall be collected together with the Association fees.

Boreholes of Wind Plants Projects

Height Number of Exploration Points Depths (By Linear Meter)
Up to 50 square meters 2 (10, 20)
50-70 square meters 2 (15, 25)
Above 75 square meters 2 (25, 35)